PE-12 Emergency Lighting
Employ and maintain automatic emergency lighting for the system that activates in the event of a power outage or disruption and that covers emergency exits and evacuation routes within the facility.
Source: NIST SP 800-53 Rev 5, PE-12. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Emergency lighting test records · Physical access / facilities
- Test of Mechanisms supporting and/or implementing an emergency lighting capability · Physical access / facilities
governing documentDocuments that govern the control
- Physical and environmental protection policy · Policy repository / GRC workspace
- Procedures addressing emergency lighting · Policy repository / GRC workspace
- Emergency lighting documentation · Policy repository / GRC workspace
- Emergency exits and evacuation routes · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Automatic emergency lighting does not cover all emergency exits and evacuation routes within the facility housing the system
- Emergency lighting is not maintained, with no records of testing to confirm it activates on power disruption
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-11(2) Emergency Power | Alternate Power Supply: Self-contained · PE-12(1) Emergency Lighting | Essential Mission and Business Functions