EvidenceSheet

PE-11 Emergency power

Requires an uninterruptible power supply able to support either an orderly system shutdown or a transition to longer term alternate power when the primary power source is lost.

4
artefacts
1
held by a system
1
at each review
moderate
to go live
Physical access / facilities
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

  • Evidence of automated orderly shutdown configuration where that option is used · Physical access / facilities

periodic reviewEvidence produced at each review

  • Maintenance, battery replacement and load test records · Physical access / facilities

governing documentDocuments that govern the control

  • Uninterruptible power supply specification and the runtime it provides · Policy repository / GRC workspace
  • Documented choice between orderly shutdown and transition to alternate power · Policy repository / GRC workspace

First move

Start with the 1 of 4 artefacts that already live in a system (Physical access / facilities); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

PE-10 Emergency shutoff · PE-12 Emergency lighting