PE-11(1) Emergency Power | Alternate Power Supply: Minimal Operational Capability
Provide an alternate power supply for the system that is activated Selection: manually; automatically and that can maintain minimally required operational capability in the event of an extended loss of the primary power source.
Source: NIST SP 800-53 Rev 5, PE-11(1). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Alternate power supply test records · Physical access / facilities
- Test of Mechanisms supporting and/or implementing an alternate power supply; the alternate power supply · Physical access / facilities
governing documentDocuments that govern the control
- Physical and environmental protection policy · Policy repository / GRC workspace
- Procedures addressing emergency power · Policy repository / GRC workspace
- Alternate power supply · Policy repository / GRC workspace
- Alternate power supply documentation · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- No alternate power supply exists to maintain minimally required operational capability during extended primary power loss
- Alternate generator activation, manual or automatic as selected, has never been tested under load for the system
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-11 Emergency Power · PE-11(2) Emergency Power | Alternate Power Supply: Self-contained