PE-13 Fire Protection
Employ and maintain fire detection and suppression systems that are supported by an independent energy source.
Source: NIST SP 800-53 Rev 5, PE-13. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Test records of fire suppression and detection devices/systems · Physical access / facilities
- Test of Mechanisms supporting and/or implementing fire suppression/detection devices/systems · Physical access / facilities
governing documentDocuments that govern the control
- Physical and environmental protection policy · Policy repository / GRC workspace
- Procedures addressing fire protection · Policy repository / GRC workspace
- Fire suppression and detection devices/systems · Policy repository / GRC workspace
- Fire suppression and detection devices/systems documentation · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Fire detection and suppression systems are not supported by an independent energy source during a power outage
- Fire detection and suppression equipment lacks inspection and maintenance records confirming it remains operational
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-12(1) Emergency Lighting | Essential Mission and Business Functions · PE-13(1) Fire Protection | Detection Systems: Automatic Activation and Notification