PS-06 Protection against interruptions caused by power failures and other such risks
Document and install supply resilience for production systems, covering N+1 power and cooling, correctly sized UPS and emergency generators tested at least annually, manufacturer aligned maintenance, and protection of power and telecommunications cabling inspected at least every two years.
Source: BSI C5 (121-criteria catalogue), PS-06. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Battery capacity measurement results for each UPS string · Backup / DR tooling
periodic reviewEvidence produced at each review
- Load bank and black start test report for the generator set · Backup / DR tooling
- Cable distributor inspection record covering seals, earthing and patch documentation · Vulnerability scanner / patch tooling
governing documentDocuments that govern the control
- Single line electrical diagram showing the N+1 arrangement per hall · Policy repository / GRC workspace
- Fuel supply contract together with on site fuel stock readings · Policy repository / GRC workspace
First move
Common gaps auditors find
- Generator started monthly off load so genuine capacity is never proven
- UPS batteries beyond service life with no capacity measurement on file
- Distributors inspected for tidiness but not for signs of tampering or undocumented patching
- Resilience lost because both rack feeds trace back to one distribution board
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPS-05 Protection from fire and smoke · PS-07 Surveillance of operational and environmental parameters