PS-06 Protection against interruptions caused by power failures and other such risks

Document and install supply resilience for production systems, covering N+1 power and cooling, correctly sized UPS and emergency generators tested at least annually, manufacturer aligned maintenance, and protection of po

5
artefacts
0
held by a system
2
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Load bank and black start test report for the generator set · Backup / DR tooling
  • Cable distributor inspection record covering seals, earthing and patch documentation · Vulnerability scanner / patch tooling

governing documentDocuments that govern the control

  • Single line electrical diagram showing the N+1 arrangement per hall · Policy repository / GRC workspace
  • Battery capacity measurement results for each UPS string · Policy repository / GRC workspace
  • Fuel supply contract together with on site fuel stock readings · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

PS-05 Protection from fire and smoke · PS-07 Surveillance of operational and environmental parameters