EvidenceSheet

PS-07 Surveillance of operational and environmental parameters

Continuously measure and regulate the operating parameters of technical utilities and the environmental conditions of the buildings, automatically informing the responsible departments when a value leaves the permitted control range so it can be returned promptly.

Source: BSI C5 (121-criteria catalogue), PS-07. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.

The edition of the catalogue is not stamped here; check the edition your attestation is issued against.

4
artefacts
2
held by a system
1
at each review
easy
to go live
SIEM / log platform
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Temperature and humidity trend export for a sampled cold aisle · SIEM / log platform
  • Alarm ticket showing routing to facilities and the time taken to return within range · Physical access / facilities

periodic reviewEvidence produced at each review

  • Calibration certificates for the environmental sensors · SIEM / log platform

governing documentDocuments that govern the control

  • Building management system point list with the configured alarm thresholds · Policy repository / GRC workspace

First move

Automate the pull from your SIEM / log platform. Retention and alert rules exported from the SIEM; review evidence is the closed-alert record with reviewer and time.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

PS-06 Protection against interruptions caused by power failures and other such risks · PSS-01 Guidelines and Recommendations for Cloud Customers