EvidenceSheet

SR-11 Component authenticity

Requires anti-counterfeit policy and procedures to be developed and put into practice, including how counterfeit components are detected and kept out of the system, and requires any counterfeit component found to be repo

4
artefacts
0
held by a system
3
at each review
hard
to go live
Document repository
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Evidence of purchasing through authorised distributors or original manufacturers · Document repository
  • Inspection or verification records for received components · Document repository
  • Reporting records where counterfeit components were identified · Document repository

governing documentDocuments that govern the control

  • Anti-counterfeit policy and procedures including detection methods · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

SR-10 Inspection of systems or components · SR-12 Component disposal