SI-7(8) Software, Firmware, and Information Integrity | Auditing Capability for Significant Events
Upon detection of a potential integrity violation, provide the capability to audit the event and initiate the following actions: Selection (one or more): generate an audit record; alert current user; alert [organization-defined personnel or roles; organization-defined other actions].
Source: NIST SP 800-53 Rev 5, SI-7(8). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Records of integrity scans · Vulnerability scanner / patch tooling
- Incident response records · Document repository
periodic reviewEvidence produced at each review
- Test of Software, firmware, and information integrity verification tools; mechanisms supporting and/or implementing the capability to audit potential integrity violations; mechanisms supporting and/or implementing alerts about potential integrity violations · SIEM / log platform
governing documentDocuments that govern the control
- System and information integrity policy · Policy repository / GRC workspace
- System and information integrity procedures · Policy repository / GRC workspace
- Procedures addressing software, firmware, and information integrity · Policy repository / GRC workspace
- System design documentation · Document repository
- System configuration settings and associated documentation · Policy repository / GRC workspace
- Integrity verification tools and associated documentation · Document repository
- List of security-relevant changes to the system · Document repository
First move
Common gaps auditors find
- Potential integrity violations are not audited on detection
- No alerts or actions from the selection are configured for integrity violations
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSI-7(7) Software, Firmware, and Information Integrity | Integration of Detection and Response · SI-7(9) Software, Firmware, and Information Integrity | Verify Boot Process