SI-17 Fail-safe Procedures
Implement the indicated fail-safe procedures when the indicated failures occur: organization-defined list of failure conditions and associated fail-safe procedures.
Source: NIST SP 800-53 Rev 5, SI-17. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- System audit records · Policy repository / GRC workspace
- Test of Organizational fail-safe procedures; automated mechanisms supporting and/or implementing fail-safe procedures · Policy repository / GRC workspace
governing documentDocuments that govern the control
- System and information integrity policy · Policy repository / GRC workspace
- System and information integrity procedures · Policy repository / GRC workspace
- Documentation addressing fail-safe procedures for the system · Policy repository / GRC workspace
- System design documentation · Document repository
- System configuration settings and associated documentation · Policy repository / GRC workspace
- List of security safeguards protecting the system memory from unauthorized code execution · Document repository
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- The failure conditions and associated fail-safe procedures were never defined
- Fail-safe procedures are not implemented when the indicated failures occur
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSI-16 Memory Protection · SI-18 Personally Identifiable Information Quality Operations