SC-39(1) Process Isolation | Hardware Separation
Implement hardware separation mechanisms to facilitate process isolation.
Source: NIST SP 800-53 Rev 5, SC-39(1). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Test of System capability implementing underlying hardware separation mechanisms for process separation · Document repository
governing documentDocuments that govern the control
- System and communications protection policy · Policy repository / GRC workspace
- System design documentation · Document repository
- System configuration settings and associated documentation · Policy repository / GRC workspace
- System architecture · Policy repository / GRC workspace
- System documentation for hardware separation mechanisms · Document repository
- System documentation from vendors, manufacturers, or developers · Vendor register / contract repository
- Independent verification and validation documentation · Document repository
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Process isolation relies on software alone without hardware separation mechanisms
- Hardware isolation features such as memory protection are disabled
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSC-39 Process Isolation · SC-39(2) Process Isolation | Separate Execution Domain Per Thread