PL-11 Baseline Tailoring
Tailor the selected control baseline by applying specified tailoring actions.
Source: NIST SP 800-53 Rev 5, PL-11. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- System categorization decision · Document repository
- Stakeholder needs analysis · Document repository
governing documentDocuments that govern the control
- Security and privacy planning policy · Policy repository / GRC workspace
- Procedures addressing system security and privacy plan development and implementation · Policy repository / GRC workspace
- System design documentation · Document repository
- Information types stored, transmitted, and processed by the system · Document repository
- System element/component information · Document repository
- List of security and privacy requirements allocated to the system, system elements, and environment of operation · Policy repository / GRC workspace
- List of contractual requirements allocated to external providers of the system or system element · Document repository
First move
Common gaps auditors find
- Tailoring actions applied to the selected baseline are not documented with rationale in the security and privacy plan
- Controls were removed from the baseline as not applicable without a documented tailoring decision or approval
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPL-10 Baseline Selection · PM-1 Information Security Program Plan