EvidenceSheet

PE-22 Component Marking. Mark [organization-defined] indicating the impact level or classification level of the information permitted to be processed, stored, or transmitted by the hardware component

Component Marking. Mark [organization-defined] indicating the impact level or classification level of the information permitted to be processed, stored, or transmitted by the hardware component.

5
artefacts
0
held by a system
1
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Physical inspection record or photographs showing markings in place and legible · Physical access / facilities

governing documentDocuments that govern the control

  • The defined hardware components required to carry a marking, and the marking scheme used · Policy repository / GRC workspace
  • Information types held and the impact or classification level assigned to each · Policy repository / GRC workspace
  • Component inventory cross referenced to the marking actually applied to each item · Policy repository / GRC workspace
  • Procedure for re-marking when a component's permitted processing level changes · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

PE-21 Electromagnetic Pulse Protection. Employ [organization-defined] against electromagnetic pulse damage for [organization-defined] · PE-23 Facility Location. Plan the location or site of the facility where the system resides considering physical and environmental hazards; and For existing facilities, consider the physical and environmental hazards in the organizational risk management