PE-21 Electromagnetic Pulse Protection
Employ organization-defined protective measures against electromagnetic pulse damage for organization-defined systems and system components.
Source: NIST SP 800-53 Rev 5, PE-21. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Test of Mechanisms for mitigating EMP risk · Physical access / facilities
governing documentDocuments that govern the control
- Physical and environmental protection policy · Policy repository / GRC workspace
- Procedures addressing protective measures to mitigate EMP risk to systems and components · Policy repository / GRC workspace
- Documentation detailing protective measures to mitigate EMP risk · Policy repository / GRC workspace
- List of locations where protective measures to mitigate EMP risk are implemented · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- No protective measures against electromagnetic pulse damage exist for the defined systems
- The systems requiring electromagnetic pulse protection were never identified
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-20 Asset Monitoring and Tracking · PE-22 Component Marking