PE-19 Information Leakage
Protect the system from information leakage due to electromagnetic signals emanations.
Source: NIST SP 800-53 Rev 5, PE-19. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Records from electromagnetic signal emanation tests · Physical access / facilities
- Test of Mechanisms supporting and/or implementing protection from information leakage due to electromagnetic signal emanations · Physical access / facilities
governing documentDocuments that govern the control
- Physical and environmental protection policy · Policy repository / GRC workspace
- Procedures addressing information leakage due to electromagnetic signal emanations · Policy repository / GRC workspace
- Mechanisms protecting the system against electronic signal emanations · Policy repository / GRC workspace
- Facility housing the system · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- No assessment addresses information leakage through electromagnetic emanations
- Protections against emanations are not in place for components processing sensitive information
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-18 Location of System Components · PE-19(1) Information Leakage | National Emissions Policies and Procedures