PE-19(1) Information Leakage | National Emissions Policies and Procedures
Protect system components, associated data communications, and networks in accordance with national Emissions Security policies and procedures based on the security category or classification of the information.
Source: NIST SP 800-53 Rev 5, PE-19(1). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Test of Information system components for compliance with national emissions and TEMPEST policies and procedures · Physical access / facilities
governing documentDocuments that govern the control
- Physical and environmental protection policy · Policy repository / GRC workspace
- Procedures addressing information leakage that comply with national emissions and TEMPEST policies and procedures · Policy repository / GRC workspace
- System component design documentation · Policy repository / GRC workspace
- System configuration settings and associated documentation system security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Components and communications are not protected according to national emissions security policies
- The information's security category was not used to determine emissions security requirements