PE-16 Delivery and Removal
a. Authorize and control organization-defined types of system components entering and exiting the facility; and b. Maintain records of the system components.
Source: NIST SP 800-53 Rev 5, PE-16. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Records of items entering and exiting the facility · Physical access / facilities
- Test of Organizational process for authorizing, monitoring, and controlling system-related items entering and exiting the facility; mechanisms supporting and/or implementing, authorizing, monitoring, and controlling system-related items entering and exiting the facility · Physical access / facilities
governing documentDocuments that govern the control
- Physical and environmental protection policy · Policy repository / GRC workspace
- Procedures addressing the delivery and removal of system components from the facility · Policy repository / GRC workspace
- Facility housing the system · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- System components enter and leave the facility without authorization, with no control at loading docks or exits
- No records are maintained of system components delivered to or removed from the facility
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-15(1) Water Damage Protection | Automation Support · PE-17 Alternate Work Site