MA-5(5) Maintenance Personnel | Non-system Maintenance
Ensure that non-escorted personnel performing maintenance activities not directly associated with the system but in the physical proximity of the system, have required access authorizations.
Source: NIST SP 800-53 Rev 5, MA-5(5). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Maintenance records · Document repository
- Access control records · Identity provider / directory
governing documentDocuments that govern the control
- Maintenance policy · Policy repository / GRC workspace
- Procedures addressing maintenance personnel · Policy repository / GRC workspace
- System media protection policy · Policy repository / GRC workspace
- Access control policy and procedures · Policy repository / GRC workspace
- Physical and environmental protection policy and procedures · Policy repository / GRC workspace
- Access authorizations · Document repository
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Unescorted personnel doing non-system maintenance near the system lack required access authorizations
- No check confirms authorizations for facility contractors working in proximity to the system
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetMA-5(4) Maintenance Personnel | Foreign Nationals · MA-6 Timely Maintenance