CP-6(3) Alternate Storage Site | Accessibility
Identify potential accessibility problems to the alternate storage site in the event of an area-wide disruption or disaster and outline explicit mitigation actions.
Source: NIST SP 800-53 Rev 5, CP-6(3). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Organizational risk assessments · Document repository
governing documentDocuments that govern the control
- Contingency planning policy · Policy repository / GRC workspace
- Procedures addressing alternate storage sites · Policy repository / GRC workspace
- Contingency plan · Policy repository / GRC workspace
- Alternate storage site · Document repository
- List of potential accessibility problems to alternate storage site · Document repository
- Mitigation actions for accessibility problems to alternate storage site · Document repository
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Potential accessibility problems to the alternate storage site during an area-wide disaster were never identified
- Accessibility risks to alternate storage are noted but no explicit mitigation actions are outlined
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCP-6(2) Alternate Storage Site | Recovery Time and Recovery Point Objectives · CP-7 Alternate Processing Site