CP-2(2) Contingency Plan | Capacity Planning
Conduct capacity planning so that necessary capacity for information processing, telecommunications, and environmental support exists during contingency operations.
Source: NIST SP 800-53 Rev 5, CP-2(2). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
none for this control
governing documentDocuments that govern the control
- Contingency planning policy · Policy repository / GRC workspace
- Procedures addressing contingency operations for the system · Policy repository / GRC workspace
- Contingency plan · Policy repository / GRC workspace
- Capacity planning documents · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- No capacity analysis shows processing, telecommunications and environmental support are sufficient during contingency operations
- Capacity planning covers primary operations only and ignores reduced capacity at the alternate site during contingency operations
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCP-2(1) Contingency Plan | Coordinate with Related Plans · CP-2(3) Contingency Plan | Resume Mission and Business Functions