CP-2(1) Contingency Plan | Coordinate with Related Plans
Coordinate contingency plan development with organizational elements responsible for related plans.
Source: NIST SP 800-53 Rev 5, CP-2(1). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
none for this control
governing documentDocuments that govern the control
- Contingency planning policy · Policy repository / GRC workspace
- Procedures addressing contingency operations for the system · Policy repository / GRC workspace
- Contingency plan · Policy repository / GRC workspace
- Business contingency plans · Policy repository / GRC workspace
- Disaster recovery plans · Policy repository / GRC workspace
- Continuity of operations plans · Policy repository / GRC workspace
- Crisis communications plans · Policy repository / GRC workspace
- Critical infrastructure plans · Policy repository / GRC workspace
- Cyber incident response plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Contingency plan was drafted without input from owners of the business continuity, disaster recovery and crisis communications plans
- No evidence shows the contingency plan was reconciled with related plans for conflicting roles or recovery sequences
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCP-2 Contingency Plan · CP-2(2) Contingency Plan | Capacity Planning