CA-7(3) Continuous Monitoring | Trend Analyses
Employ trend analyses to determine if control implementations, the frequency of continuous monitoring activities, and the types of activities used in the continuous monitoring process need to be modified based on empirical data.
Source: NIST SP 800-53 Rev 5, CA-7(3). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- System monitoring records · SIEM / log platform
periodic reviewEvidence produced at each review
- Assessment report · SIEM / log platform
- Impact analyses · SIEM / log platform
- Test of Mechanisms supporting trend analyses · SIEM / log platform
governing documentDocuments that govern the control
- Organizational continuous monitoring strategy · Policy repository / GRC workspace
- System-level continuous monitoring strategy · Policy repository / GRC workspace
- Assessment, authorization, and monitoring policy · Policy repository / GRC workspace
- Procedures addressing continuous monitoring of system controls · Policy repository / GRC workspace
- Privacy controls · Policy repository / GRC workspace
- Plan of action and milestones · Policy repository / GRC workspace
First move
Common gaps auditors find
- Continuous monitoring frequencies and activities are never adjusted using trend analysis of empirical data
- Monitoring data is collected but no trend analyses are performed or recorded
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCA-7(1) Continuous Monitoring | Independent Assessment · CA-7(4) Continuous Monitoring | Risk Monitoring