CA-7(1) Continuous Monitoring | Independent Assessment
Employ independent assessors or assessment teams to monitor the controls in the system on an ongoing basis.
Source: NIST SP 800-53 Rev 5, CA-7(1). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- System monitoring records · SIEM / log platform
- Status reports · SIEM / log platform
periodic reviewEvidence produced at each review
- Control assessment report · SIEM / log platform
- Impact analyses · SIEM / log platform
governing documentDocuments that govern the control
- Assessment, authorization, and monitoring policy · Policy repository / GRC workspace
- Organizational continuous monitoring strategy · Policy repository / GRC workspace
- System-level continuous monitoring strategy · Policy repository / GRC workspace
- Procedures addressing continuous monitoring of system controls · Policy repository / GRC workspace
- Plan of action and milestones · Policy repository / GRC workspace
First move
Common gaps auditors find
- Ongoing control monitoring is performed only by system operations staff with no independent assessor involvement
- Independent assessors are used at authorization but not engaged for ongoing monitoring of system controls
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCA-7 Continuous Monitoring · CA-7(3) Continuous Monitoring | Trend Analyses