CA-3(7) Information Exchange | Transitive Information Exchanges
(a) Identify transitive (downstream) information exchanges with other systems through the systems identified in CA-3a; and (b) Take measures to ensure that transitive (downstream) information exchanges cease when the controls on identified transitive (downstream) systems cannot be verified or validated.
Source: NIST SP 800-53 Rev 5, CA-3(7). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Test of Mechanisms implementing restrictions on external system connections · SIEM / log platform
governing documentDocuments that govern the control
- Access control policy · Policy repository / GRC workspace
- Procedures addressing system connections · Policy repository / GRC workspace
- System and communications protection policy · Policy repository / GRC workspace
- System interconnection agreements · Policy repository / GRC workspace
- Information exchange security agreements · Policy repository / GRC workspace
- Memoranda of understanding or agreements · Policy repository / GRC workspace
- Service level agreements · Policy repository / GRC workspace
- Non-disclosure agreements · Policy repository / GRC workspace
- System design documentation · Policy repository / GRC workspace
First move
Common gaps auditors find
- Transitive downstream information exchanges through connected systems were never identified
- Downstream exchanges continue although controls on the downstream systems cannot be verified
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCA-3(6) Information Exchange | Transfer Authorizations · CA-5 Plan of Action and Milestones