CA-2(3) Control Assessments | Leveraging Results from External Organizations
Leverage the results of control assessments performed by organization-defined external organization on organization-defined system when the assessment meets organization-defined requirements.
Source: NIST SP 800-53 Rev 5, CA-2(3). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Procedures addressing control assessments · SIEM / log platform
- Control assessment report · SIEM / log platform
- Control assessment evidence · SIEM / log platform
governing documentDocuments that govern the control
- Assessment, authorization, and monitoring policy · Policy repository / GRC workspace
- Control assessment requirements · Policy repository / GRC workspace
- Control assessment plan · Policy repository / GRC workspace
- Plan of action and milestones · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
- Privacy plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Assessment results from external organizations are reused without checking they meet the defined requirements
- The external organizations and systems whose assessment results may be leveraged were never defined
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCA-2(2) Control Assessments | Specialized Assessments · CA-3 Information Exchange