CA-2(1) Control Assessments | Independent Assessors
Employ independent assessors or assessment teams to conduct control assessments.
Source: NIST SP 800-53 Rev 5, CA-2(1). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Procedures addressing control assessments · SIEM / log platform
- Previous control assessment report · SIEM / log platform
governing documentDocuments that govern the control
- Assessment, authorization, and monitoring policy · Policy repository / GRC workspace
- Previous control assessment plan · Policy repository / GRC workspace
- Plan of action and milestones · Policy repository / GRC workspace
- Existing authorization statement · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
- Privacy plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Control assessments are performed by staff who operate or manage the system, so assessor independence is not achieved
- No documented criteria show how assessor independence was determined for the assessment team
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCA-2 Control Assessments · CA-2(2) Control Assessments | Specialized Assessments