A.7.3 Securing offices, rooms and facilities
Design and apply physical security for offices, rooms and facilities.
16
artefacts
3
held by a system
3
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review
system holds itEvidence a system already holds
- Access control system audit logs · Physical access / facilities
- Visitor log register · Physical access / facilities
- Temperature and humidity monitoring logs · SIEM / log platform
periodic reviewEvidence produced at each review
- Contractor badge issuance records · Physical access / facilities
- Risk assessment for secure areas · Physical access / facilities
- Fire detection and suppression inspection reports · Physical access / facilities
governing documentDocuments that govern the control
- Access control policy document · Policy repository / GRC workspace
- Electronic access card issuance register · Policy repository / GRC workspace
- Key and lock inventory list · Policy repository / GRC workspace
- Visitor pre approval forms · Policy repository / GRC workspace
- Visitor escort procedures document · Policy repository / GRC workspace
- Floor plan with security zones · Policy repository / GRC workspace
- Door and window lock specifications · Policy repository / GRC workspace
- Security camera placement diagram · Policy repository / GRC workspace
- Environmental controls maintenance schedule · Document repository
- Power outage contingency plan · Policy repository / GRC workspace
First move
Mostly documents and reviews. Pull the 3 system-held artefacts from your Physical access / facilities on a schedule; put the documents under version control with an owner and review date, and log each review as a dated record with a named reviewer.
Common gaps auditors find
- informal lock checks replace documented maintenance
- visitor logs missing timestamps or signatures
- floor plans not updated to reflect current security zones
- absence of records for lock and alarm system testing