EvidenceSheet

8.4.4 Business continuity plans

Document and maintain business continuity plans that guide teams through response and recovery, collectively containing the actions to continue or recover prioritized activities within predetermined time frames, the mean

5
artefacts
0
held by a system
1
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Evidence of availability at the point of use, including offline copies · Policy repository / GRC workspace

governing documentDocuments that govern the control

  • Plan set with each plan carrying every required element · Policy repository / GRC workspace
  • Activation criteria and thresholds stated in the plan itself · Policy repository / GRC workspace
  • Interdependency and resource sections reconciled to the BIA · Policy repository / GRC workspace
  • Stand down process defined · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

8.4.3 Warning and communication · 8.4.5 Recovery