PE-15 Water Damage Protection. Protect the system from damage resulting from water leakage by providing master shutoff or isolation valves that are accessible, working properly, and known to key personnel
Water Damage Protection. Protect the system from damage resulting from water leakage by providing master shutoff or isolation valves that are accessible, working properly, and known to key personnel.
5
artefacts
2
held by a system
2
at each review
moderate
to go live
Physical access / facilities
where the evidence lives
teal = a system already holds it · olive = produced at each review
system holds itEvidence a system already holds
- CCTV retention configuration and footage spot check evidence · Physical access / facilities
- Environmental monitoring readings for temperature, humidity, and water leak sensors · Physical access / facilities
periodic reviewEvidence produced at each review
- Visitor sign in records with escort assignment · Physical access / facilities
- Fire suppression and UPS maintenance records · Backup / DR tooling
governing documentDocuments that govern the control
- Control implementation statement for PE-15 citing the system mission and inheritance from common controls · Policy repository / GRC workspace
First move
Start with the 2 of 5 artefacts that already live in a system (Physical access / facilities); keep the periodic reviews but log each one as a dated record with a named reviewer.
Common gaps auditors find
- Server room doors propped open during cooling failures
- CCTV coverage gaps at loading docks and equipment delivery areas
- Tailgating observed without challenge during walkthroughs
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheet