CM-5 Access Restrictions for Change
Define, document, approve, enforce physical and logical access restrictions for changes.
Source: FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline), CM-5. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Repository and deployment pipeline permission exports showing production change rights limited to approved staff · Identity provider / directory
- Configuration drift detection reports from the CMDB or tooling · Cloud console / configuration management
- Software inventory generated from authoritative discovery tooling · Cloud console / configuration management
- Emergency change records with retroactive approvals · Cloud console / configuration management
periodic reviewEvidence produced at each review
- Change advisory board minutes with risk assessments · Cloud console / configuration management
governing documentDocuments that govern the control
- SSP CM-5 statement listing who may change production, how access is enforced (pipeline only, break-glass) and how changes are logged · Policy repository / GRC workspace
First move
Common gaps auditors find
- Baselines exist on paper but production hosts drift without alerting
- Emergency changes bypass CAB and lack retrospective review
- Unauthorised software present on endpoints not flagged by tooling
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCM-4(2) Impact Analyses | Verification of Controls (CM-4(2)) · CM-5(1) Access Restrictions for Change | Automated Access Enforcement and Audit Records (CM-5(1))