EvidenceSheet

CM-4(2) Impact Analyses | Verification of Controls. After system changes, verify that the impacted controls are implemented correctly, operating as intended, and producing the desired outcome with regard to meeting the security and privacy requirements

Impact Analyses | Verification of Controls. After system changes, verify that the impacted controls are implemented correctly, operating as intended, and producing the desired outcome with regard to meeting the security .

3
artefacts
1
held by a system
0
at each review
moderate
to go live
Ticketing / ITSM
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

  • Tickets linking change to verification · Ticketing / ITSM

periodic reviewEvidence produced at each review

none for this control

governing documentDocuments that govern the control

  • Post-change verification reports · Document repository
  • Control testing results · Document repository

First move

Start with the 1 of 3 artefacts that already live in a system (Ticketing / ITSM); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

CM-4 Impact Analyses · CM-5 Access Restrictions for Change