EvidenceSheet

SI-2 Flaw Remediation

Identify, report, and correct system flaws; remediate within FedRAMP-defined timeframes (HIGH critical 15d, high 30d).

6
artefacts
1
held by a system
1
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

  • Security monitoring alert tuning records · SIEM / log platform

periodic reviewEvidence produced at each review

  • Vulnerability remediation tickets with verification screenshots · Vulnerability scanner / patch tooling

governing documentDocuments that govern the control

  • Control implementation statement for SI-2 citing the system mission and inheritance from common controls · Document repository
  • Patch management policy with severity based SLAs · Policy repository / GRC workspace
  • Patch deployment reports across server, endpoint, and network estates · Policy repository / GRC workspace
  • Endpoint detection and response coverage report · Policy repository / GRC workspace

First move

Mostly documents and reviews. Pull the 1 system-held artefact from your SIEM / log platform on a schedule; put the documents under version control with an owner and review date, and log each review as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

SI-1 Policy and Procedures · SI-2(2) Automated Flaw Remediation Status