EvidenceSheet

SI-1 Policy and Procedures

Develop, document, disseminate and review the policy for system and information integrity, and its procedures, on the FedRAMP-defined cadence: policy at least annually under High and at least every three years under Moderate, procedures at least annually and after significant changes under both.

Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), SI-1. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.

A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.

6
artefacts
2
held by a system
0
at each review
moderate
to go live
SIEM / log platform
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Security monitoring alert tuning records · SIEM / log platform
  • Patch deployment reports across server, endpoint, and network estates · Vulnerability scanner / patch tooling

periodic reviewEvidence produced at each review

none for this control

governing documentDocuments that govern the control

  • SSP SI-1 statement naming the system and information integrity policy owner and its review cadence (policy yearly for High, at least every three years for Moderate; procedures yearly for both) · Policy repository / GRC workspace
  • System and information integrity policy with approval signatures · Policy repository / GRC workspace
  • Input validation standards and code review checklist · Policy repository / GRC workspace
  • Patch management policy with severity based SLAs · Policy repository / GRC workspace

First move

Start with the 2 of 6 artefacts that already live in a system (SIEM / log platform); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

SC-45(1) System Time Synchronization | Synchronization with Authoritative Time Source (SC-45(1)) · SI-2 Flaw Remediation