PE-13 Fire Protection
Employ and maintain fire suppression and detection devices independent of energy source.
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), PE-13. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- CCTV retention configuration and footage spot check evidence · Physical access / facilities
periodic reviewEvidence produced at each review
- Fire system inspection certificates and suppression system maintenance records · Physical access / facilities
- Physical security policy and facility risk assessment · Physical access / facilities
- Badge access system audit log and door alarm reports · Physical access / facilities
- Visitor sign in records with escort assignment · Physical access / facilities
governing documentDocuments that govern the control
- SSP PE-13 statement describing fire detection and suppression systems with independent power and the service schedule · Policy repository / GRC workspace
First move
Common gaps auditors find
- Server room doors propped open during cooling failures
- CCTV coverage gaps at loading docks and equipment delivery areas
- Tailgating observed without challenge during walkthroughs
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-12 Emergency Lighting · PE-13(1) Fire Protection | Detection Systems: Automatic Activation and Notification (PE-13(1))