PS-04 Physical site access control
Control entry at every access point using an access control system whose documented rules grant least privilege authorisations, revoke unused rights after two and six months, enforce two factor authentication for areas holding customer data, escort visitors and log all entries.
Source: BSI C5 (121-criteria catalogue), PS-04. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Badge system export showing authorisation holders per security area · Physical access / facilities
- Door reader event log for a sampled high security room · Physical access / facilities
periodic reviewEvidence produced at each review
- Report of automatically revoked credentials with the recorded inactivity dates · Physical access / facilities
governing documentDocuments that govern the control
- Visitor register with escort names and pass return times · Policy repository / GRC workspace
First move
Common gaps auditors find
- Dormant contractor badges still active well past the stated inactivity limit
- Two factor reader on the machine room door bypassed through an adjacent office door
- Visitors recorded at reception yet not tracked by the badge system inside the building
- No periodic reconciliation of badge holders against current job roles
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPS-03 Perimeter Protection · PS-05 Protection from fire and smoke