PS-02 Redundancy model
Deliver the cloud service from two mutually redundant sites that both satisfy the provider's physical security requirements, sit far enough apart to give operational redundancy meeting agreed availability levels, and test that redundancy at least yearly.
Source: BSI C5 (121-criteria catalogue), PS-02. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Failover test report from the most recent annual redundancy exercise · Backup / DR tooling
governing documentDocuments that govern the control
- Site pair topology diagram showing the separation distance between redundant locations · Policy repository / GRC workspace
- Availability clauses of the service level agreement mapped onto the redundancy design · Policy repository / GRC workspace
- Capacity figures proving the surviving site can carry full production load · Policy repository / GRC workspace
First move
Common gaps auditors find
- Second site sized only for partial load so failover silently degrades the service
- Redundancy asserted on paper but never exercised within the last twelve months
- Locations placed too close together to survive a single regional event
- Secondary location held to weaker physical security controls than the primary
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPS-01 Physical Security and Environmental Control Requirements · PS-03 Perimeter Protection