PS-01 Physical Security and Environmental Control Requirements
Derive documented physical and environmental security requirements for all premises and data centres from risk assessment and identified protection needs, addressing planning faults, intrusion, surveillance, climate control, fire, water, power and ventilation, including requirements imposed on third party site operators.
Source: BSI C5 (121-criteria catalogue), PS-01. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Site level protection requirement analysis for each data centre · Physical access / facilities
- Record of the technology standards or building codes cited as the design basis · Physical access / facilities
governing documentDocuments that govern the control
- Signed physical and environmental security concept listing the eight hazard classes · Policy repository / GRC workspace
- Contractual security requirement annex imposed on third party landlords · Policy repository / GRC workspace
First move
Common gaps auditors find
- Concept written once at build time and never revisited after new sites were added
- Third party operated colocation sites left outside the documented requirements
- Hazards such as water ingress and air filtration named with no requirement attached to them
- No traceable link from risk assessment results to the stated building requirements