OPS-04 Protection Against Malware - Concept
Maintain approved and communicated malware protection policies stating which system specific protection mechanisms apply, how protection programs run on production components the provider is responsible for, and how they run on employee terminal equipment.
Source: BSI C5 (121-criteria catalogue), OPS-04. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Distribution evidence showing the policy reached operations and end user support staff · Endpoint management (MDM / EDR)
governing documentDocuments that govern the control
- Approved malware protection policy with version history and approval signature · Policy repository / GRC workspace
- Inventory of system classes mapped to the protection mechanism selected for each · Policy repository / GRC workspace
- Management console hardening standard referenced by the policy · Policy repository / GRC workspace
First move
Common gaps auditors find
- Policy covers office endpoints yet says nothing about production servers or container images
- No stated mechanism for systems that cannot run a resident scanner
- Policy approved years ago and untouched since the platform moved to containers
- Management consoles treated as outside the scope of malware controls
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetOPS-03 Capacity Management - Controlling of Resources · OPS-05 Protection Against Malware - Implementation