DEV-10 Separation of environments
Keep production environments physically or logically apart from development and test environments to prevent unauthorised access to customer data, malware spread and unintended component changes, and do not use production data inside those non-production environments.
Source: BSI C5 (121-criteria catalogue), DEV-10. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Scan or review results showing non-production stores hold no live customer content · Vulnerability scanner / patch tooling
governing documentDocuments that govern the control
- Environment inventory marking the boundary between production and non-production · Policy repository / GRC workspace
- Access and network controls stopping non-production systems from reaching production · Policy repository / GRC workspace
- Method for producing test data by anonymisation or synthesis · Policy repository / GRC workspace
First move
Common gaps auditors find
- Production copies loaded into test systems to reproduce a defect and then left in place
- Accounts and credentials that span both production and development estates
- Separation claimed logically while both estates share one platform with no enforcing control
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetDEV-09 Approvals for provision in the production environment · HR-01 Verification of qualification and trustworthiness