EvidenceSheet

DEV-01 Policies for the development/procurement of information systems

Issue secure development policies covering the whole service lifecycle and grounded in recognised standards, addressing security in requirements, design, implementation, testing and verification, in software deployment i

4
artefacts
0
held by a system
0
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

none for this control

governing documentDocuments that govern the control

  • Secure development policy naming the standard or method it is built on · Policy repository / GRC workspace
  • Lifecycle description running from requirements through to operational vulnerability handling · Policy repository / GRC workspace
  • Deployment security instruction covering the continuous delivery route · Policy repository / GRC workspace
  • Proof that the policy was issued to internal developers and contracted development staff · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

CRY-04 Secure key management · DEV-02 Outsourcing of the development