CPS 234 para 27 Systematic testing of control effectiveness
The entity tests whether its security controls work through a systematic testing program. How it tests and how often must reflect: (a) how quickly vulnerabilities and threats change; (b) the asset's criticality and sensitivity; (c) what an incident would cause; (d) the risks of exposure to untrusted environments where the entity cannot enforce its security policies; and (e) how material and frequent changes to the assets are.
Source: APRA CPS 234, CPS 234 para 27. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open APRA CPS 234 in the compliance library.
Applies to APRA-regulated entities.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Penetration test, vulnerability assessment and red team reports · Vulnerability scanner / patch tooling
- Test coverage analysis showing untrusted-environment exposures (internet-facing, mobile, third-party) are tested · Endpoint management (MDM / EDR)
governing documentDocuments that govern the control
- Documented control testing program with scope, methods and frequency rationale · Policy repository / GRC workspace
- Testing schedule tied to asset classification and threat change · Policy repository / GRC workspace
- Control testing results register with pass, fail and remediation status · Policy repository / GRC workspace
First move
Common gaps auditors find
- Testing is an annual penetration test only, not a program covering control effectiveness
- Frequency not linked to criticality or rate of change
- Systems that change often tested on the same cycle as static ones
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCPS 234 para 26 Annual review and testing of response plans · CPS 234 para 28 Assess reliance on third-party control testing