CPS 234 para 21 Implement controls proportionate to risk and lifecycle
The entity has security controls protecting its information assets, third-party-managed ones included, put in place in good time and calibrated to (a) the threats and vulnerabilities in play, (b) the assets' criticality and sensitivity, (c) where each asset sits in its life-cycle, from planning and design to decommissioning and disposal, and (d) what an incident could lead to.
Source: APRA CPS 234, CPS 234 para 21. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open APRA CPS 234 in the compliance library.
Applies to APRA-regulated entities.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Risk assessments showing control selection for high-criticality and high-sensitivity assets · Document repository
- Decommissioning and media disposal records · Data governance / DLP tooling
governing documentDocuments that govern the control
- Control library or framework mapped to asset classifications · Document repository
- Secure development and system acquisition standards covering design-stage controls · Policy repository / GRC workspace
- Remediation plans with dates for control gaps identified, and evidence of timely closure · Policy repository / GRC workspace
First move
Common gaps auditors find
- Same baseline controls applied to every asset regardless of classification
- Controls designed for production but absent at design, test or disposal stages
- Known control gaps open for long periods without a plan or risk acceptance
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCPS 234 para 20 Classify information assets by criticality and sensitivity · CPS 234 para 22 Evaluate the design of third-party controls