CC5.3 COSO principle 12: Deploys control activities through policies and procedures

Deploys control activities through policies that establish what is expected and in procedures that put policies into action.

5
artefacts
0
held by a system
0
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

none for this control

governing documentDocuments that govern the control

  • Policies establishing what is expected and the procedures putting them into action, with owners and approval evidence · Policy repository / GRC workspace
  • Evidence responsibility and accountability for executing each procedure is established with competent personnel · Policy repository / GRC workspace
  • Evidence procedures are performed timely, with records showing when each was performed during the period · Policy repository / GRC workspace
  • Evidence corrective action is taken where a procedure identifies an issue · Policy repository / GRC workspace
  • Evidence policies and procedures are reassessed periodically and updated as needed · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

CC5.2 COSO principle 11: Selects and develops general controls over technology · CC6.1 Implements logical access security software, infrastructure and architectures over protected information assets