A1.3 Testing recovery plan procedures
Procedures in the recovery plan that support system recovery are tested to confirm objectives can be met. Points of focus: business continuity plan testing is performed periodically, with scenarios weighted by how likely and how severe threats are, components across the organisation and its vendors that can impair availability, and unavailability of key people or vendors (vendors added in 2022), and plans are revised from the results; and backup data is tested periodically for integrity and completeness.
Source: SOC 2 (2017 Trust Services Criteria), A1.3. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open SOC 2 (2017 Trust Services Criteria) in the compliance library.
These are criteria, not controls: you design controls that meet them, and which criteria are in scope follows the categories your report covers (Security always; Availability, Confidentiality, Processing Integrity and Privacy only if chosen). A Type 2 report tests that the controls operated across the period, so the evidence asked for is samples across that period, not one copy.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Backup restore test records with verification of completeness · Backup / DR tooling
periodic reviewEvidence produced at each review
- Disaster recovery or continuity test plan and results in the period · Backup / DR tooling
- Plan updates made after test findings · Backup / DR tooling
governing documentDocuments that govern the control
- Test scenarios covering failure of a critical vendor · Policy repository / GRC workspace
First move
Common gaps auditors find
- No recovery test performed in the period
- Restore tests confirm a file exists but not that data is complete
- Test findings never fed back into the plan
- Continuity tests assume key vendors remain available
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetA1.2 Environmental protection, backup and recovery infrastructure · C1.1 Identifying and maintaining confidential information