A1.1 Managing processing capacity
Current processing capacity and the use of infrastructure, data and software are maintained, monitored and evaluated so capacity demand can be managed and extra capacity added in time to meet objectives. Points of focus: usage is measured to set a capacity baseline and judge the risk of impaired availability; average and peak demand are forecast against capacity and tolerances, including capacity lost when components fail; and change management is triggered when forecasts exceed tolerances.
Source: SOC 2 (2017 Trust Services Criteria), A1.1. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open SOC 2 (2017 Trust Services Criteria) in the compliance library.
These are criteria, not controls: you design controls that meet them, and which criteria are in scope follows the categories your report covers (Security always; Availability, Confidentiality, Processing Integrity and Privacy only if chosen). A Type 2 report tests that the controls operated across the period, so the evidence asked for is samples across that period, not one copy.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Auto-scaling configuration or capacity change tickets · Ticketing / ITSM
periodic reviewEvidence produced at each review
- Capacity forecasts or reviews with resulting actions · Cloud console / configuration management
governing documentDocuments that govern the control
- Capacity monitoring dashboards and thresholds for key components · Policy repository / GRC workspace
First move
Common gaps auditors find
- No capacity thresholds or alerts
- Forecasts ignore failure of a component or region
- Capacity breaches with no follow-up change
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetA1.2 Environmental protection, backup and recovery infrastructure