A3.2.2.1 Post-change confirmation that PCI DSS controls are in place
Once a change is complete, the entity must confirm that every relevant PCI DSS requirement is in place on all new or modified systems and networks and update documentation where applicable. Linked to the PCI DSS scoping section; Requirements 1-12. Guidance examples of checks: updated network diagrams, configuration to hardening standards with defaults changed and unneeded services off, required controls such as FIM, anti-malware, patching and audit logging, no stored sensitive authentication data, and inclusion in quarterly vulnerability scanning. Applies only to designated entities. Customized approach objective: not eligible for the customized approach; only the defined approach can be used.
Source: PCI DSS v4.0.1, A3.2.2.1. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open PCI DSS v4.0.1 in the compliance library.
Version 4.0.1 is the active version; 4.0 has been retired. Appendix A1 applies only to multi-tenant service providers, A2 only to card-present POS POI terminals that still use SSL or early TLS, and A3 only when a payment brand or acquirer requires it. Which requirements apply to you follows your validation type.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Configuration compliance scan of newly deployed systems · Vulnerability scanner / patch tooling
periodic reviewEvidence produced at each review
- Post-implementation PCI DSS checklist attached to change records · Ticketing / ITSM
- Evidence of new systems added to vulnerability scanning and log collection · Vulnerability scanner / patch tooling
governing documentDocuments that govern the control
- Updated asset inventory and network diagrams after change · Policy repository / GRC workspace
First move
Common gaps auditors find
- Change closed without any post-implementation control verification
- New servers missing from FIM, anti-malware or logging coverage
- Diagrams and inventories not updated after the change
Do this for your whole sheet