EvidenceSheet

6.5.5 Live PANs not used in pre-production

Live PANs are not used in pre-production environments except where those environments are included in the CDE and protected in accordance with all applicable PCI DSS requirements.

5
artefacts
1
held by a system
0
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

  • Sample scans of test databases · Vulnerability scanner / patch tooling

periodic reviewEvidence produced at each review

none for this control

governing documentDocuments that govern the control

  • Policy prohibiting live PAN in test · Policy repository / GRC workspace
  • Data masking or synthetic data process · Policy repository / GRC workspace
  • Developer training on test data · HR system / LMS
  • Exception register · Policy repository / GRC workspace

First move

Mostly documents and reviews. Pull the 1 system-held artefact from your Vulnerability scanner / patch tooling on a schedule; put the documents under version control with an owner and review date, and log each review as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.