EvidenceSheet

3.7.4 Cryptoperiod and key changes

Key management policies and procedures address cryptographic key changes for keys that have reached the end of their cryptoperiod.

5
artefacts
2
held by a system
1
at each review
moderate
to go live
SIEM / log platform
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

  • Rotation log with dates · SIEM / log platform
  • Automated rotation configuration · Cloud console / configuration management

periodic reviewEvidence produced at each review

  • Re-encryption evidence · Document repository

governing documentDocuments that govern the control

  • Cryptoperiod documented per key · Document repository
  • Post-rotation validation · Document repository

First move

Start with the 2 of 5 artefacts that already live in a system (SIEM / log platform); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

3.7.3 Secure key storage · 3.7.5 Retirement or replacement of keys