EvidenceSheet

PO.5.1 Secure Development Environment Implementation

Implement and maintain secure environments for software development including source code repositories, build systems, and developer endpoints. Apply the same controls expected of production where the data sensitivity warrants.

Source: NIST SP 800-218 (SSDF), PO.5.1. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-218 (SSDF) in the compliance library.

4
artefacts
0
held by a system
1
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Source control access review records · Identity provider / directory

governing documentDocuments that govern the control

  • Developer endpoint hardening standard · Policy repository / GRC workspace
  • Build environment isolation design · Policy repository / GRC workspace
  • Monitoring coverage for development infrastructure · Policy repository / GRC workspace

First move

No system holds this evidence for you: it is people and documents. Reminders and routing to the owner still save time. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

PO.4.2 Gather and Safeguard Security Check Information · PO.5.2 Harden Development Endpoints