SR-5(2) Acquisition Strategies, Tools, and Methods | Assessments Prior to Selection, Acceptance, Modification, or…
Assess the system, system component, or system service prior to selection, acceptance, modification, or update.
Source: NIST SP 800-53 Rev 5, SR-5(2). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Security test and evaluation results · Document repository
- Vulnerability assessment results · Vulnerability scanner / patch tooling
- Penetration testing results · Vulnerability scanner / patch tooling
- Organizational risk assessment results · Policy repository / GRC workspace
- Test of Organizational processes for conducting assessments prior to selection, acceptance, or update; mechanisms supporting and/or implementing the conducting of assessments prior to selection, acceptance, or update · Document repository
governing documentDocuments that govern the control
- System security plan · Policy repository / GRC workspace
- System and services acquisition policy · Policy repository / GRC workspace
- Procedures addressing supply chain protection · Policy repository / GRC workspace
- Procedures addressing the integration of information security requirements into the acquisition process · Policy repository / GRC workspace
First move
Common gaps auditors find
- Systems or components are selected, accepted, modified or updated without prior assessment
- Assessment results are not recorded before acceptance
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSR-5(1) Acquisition Strategies, Tools, and Methods | Adequate Supply · SR-6 Supplier Assessments and Reviews