SI-8(2) Spam Protection | Automatic Updates
Automatically update spam protection mechanisms organization-defined frequency.
Source: NIST SP 800-53 Rev 5, SI-8(2). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Records of spam protection updates · Document repository
- System audit records · Policy repository / GRC workspace
- Test of Organizational processes for spam protection; mechanisms supporting and/or implementing automatic updates to spam protection mechanisms · Document repository
governing documentDocuments that govern the control
- System and information integrity policy · Policy repository / GRC workspace
- System and information integrity procedures · Policy repository / GRC workspace
- Procedures addressing spam protection · Policy repository / GRC workspace
- Spam protection mechanisms · Document repository
- System design documentation · Document repository
- System configuration settings and associated documentation · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Spam protection updates are applied manually and irregularly instead of automatically at the defined frequency
- Automatic spam signature updates failed silently for weeks with no monitoring of update success
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSI-8 Spam Protection · SI-8(3) Spam Protection | Continuous Learning Capability